Install network cabinet is not rocket science, anyone who has the right tools can complete.
Before installing the network cabinets, please ensure that you have the correct fasteners, because they will decide the stability of the rack.
Dry wall anchorage is synonymous with fasteners, usually included in the suite installed in the wall.
These are usually made from large screw, the screw thread fixed in various parts of the dry wall to ensure that strong.
No fasteners, but if you want to install the frame on plasterboard, please make sure you know how much weight can be fitted.
Some dry wall anchor to be better than the other, so you need to assess whether or not you fit your needs.
Step 1: ready for the walls
If you intend to use the wall is not so strong, the recommended you can install plywood in this part, or any other material to prepare for it.In this way can make the wall better support the weight of the network rack.
Step 2: mark and drilling
Tags can help you know the exact location of drilling, drilling is not too close or too far away.
Step 3: place the mounting bolts
It is best to use fixed flat washer to strengthen, especially when the hole is bigger than required.This will prevent the four bolts through.
Step 4: put the network rack on the bolt
Network cabinets should be firmly fixed on the bolt, don't shake.
Step 5: you want equipment installed in the network rack
Once your cabinet is ready, you can place the device you want to, but considering the maximum weight, your network cabinets can withstand.
Remember, you can always hire a professional to do heavy work.